Add more detail to repl design (#543)
This commit is contained in:
parent
27b7572842
commit
7b60d9d03d
|
@ -108,6 +108,9 @@ origin, a unique server, a timerange, or a selection of these properties. This m
|
|||
also be called a change serial number (CSN) in other application like 389 Directory
|
||||
Server
|
||||
|
||||
This is so that any allocated CID is guaranteed to be unique as the timestamp generator
|
||||
within a server is a lamport clock that always advances with each new write transaction.
|
||||
|
||||
Change
|
||||
======
|
||||
|
||||
|
@ -116,7 +119,7 @@ altered in an operation. These state records are atomic units that describe a se
|
|||
changes that must occur together to be considered valid. There may be multiple state
|
||||
assertions in a change.
|
||||
|
||||
The possible states are:
|
||||
The possible entry states are:
|
||||
|
||||
* NonExistant
|
||||
* Live
|
||||
|
@ -132,7 +135,7 @@ The possible state transitions are:
|
|||
* Tombstoned
|
||||
* Purge (*not changelogged!*)
|
||||
|
||||
A pseudocode change could be:
|
||||
A conceptual pseudocode change could be:
|
||||
|
||||
::
|
||||
|
||||
|
@ -145,7 +148,8 @@ A pseudocode change could be:
|
|||
]
|
||||
|
||||
The valid transitions are representing in a NFA, where any un-listed transition is
|
||||
considered invalid and must be discarded.
|
||||
considered invalid and must be discarded. Transitions are consider 'in-order' within
|
||||
a CID.
|
||||
|
||||
::
|
||||
|
||||
|
@ -159,14 +163,202 @@ considered invalid and must be discarded.
|
|||
.. image:: diagrams/object-lifecycle-states.png
|
||||
:width: 800
|
||||
|
||||
Changelog
|
||||
=========
|
||||
Within a single CID, in a single server, it's consider that every transition applies,
|
||||
or none do.
|
||||
|
||||
Entry Change Log
|
||||
================
|
||||
|
||||
Within Kanidm id2entry is the primary store of active entry state representation. However
|
||||
the content of id2entry is a reflection of the series of modifications and changes that
|
||||
have applied to create that entitiy. As a result id2entry can be considered as an entry
|
||||
state cache.
|
||||
|
||||
The true stable storage and representation for an entry will exist in a seperate Entry
|
||||
Change Log type. Each entry will have it's own internal changelog that represents the
|
||||
changes that have occured in the entries lifetime and it's relevant state at that time.
|
||||
|
||||
The reason for making a per-entry change log is to allow fine grained testing of the
|
||||
conflict resolution state machine on a per-entry scale, and then to be able to test
|
||||
the higher level object behaviour above that. This will allow us to model and test
|
||||
all possible states.
|
||||
|
||||
Changelog Index
|
||||
===============
|
||||
|
||||
The changelog stores a series of changes associated by their CID, allowing querying
|
||||
of changes based on CID properties. The changelog stores changes from multiple
|
||||
server uuid's or domain uuid's, acting as a single linear history of affects on
|
||||
server uuid's or domain uuid's, acting as a single linear history of effects on
|
||||
the data of this system.
|
||||
|
||||
If we assume we have a single read-write server, there is no possibility of conflict
|
||||
and the changelog becomes a perfect history of transitions within the database content.
|
||||
|
||||
We can visualise the changelog index as a series of CID's with references to the associated
|
||||
entries that need to be considered. This is where we start to consider the true implementation
|
||||
structure of how we will code this within Kanidm.
|
||||
|
||||
::
|
||||
|
||||
┌─────────────────────────────────┐ ┌─────────────────────────┐
|
||||
│ Changelog Index │ │ e1 - entry change log │
|
||||
│┌───────────────────────────────┐│ │ ┌─────────────────────┐ │
|
||||
││CID 1 ││ │ │CID 2 │ │
|
||||
│├───────────────────────────────┤│ │ │┌───────────────────┐│ │
|
||||
││ ││ │ ││create: { ││ │
|
||||
││CID 2 ││ ┌──────────┼─▶│ attrs ││ │
|
||||
││transitions { ││ │ │ ││} ││ │
|
||||
││ create: uuid - e1, ────────┼┼──┘ │ │├───────────────────┤│ │
|
||||
││ modify: uuid - e1, ────────┼┼─────────────┼─▶│ modify: attrs ││ │
|
||||
││ recycle: uuid - e2,────────┼┼──┐ │ │└───────────────────┘│ │
|
||||
││} ││ │ │ └─────────────────────┘ │
|
||||
││ ││ │ │ ... │
|
||||
│├───────────────────────────────┤│ │ │ │
|
||||
││CID 3 ││ │ │ │
|
||||
│├───────────────────────────────┤│ │ └─────────────────────────┘
|
||||
││CID 4 ││ │
|
||||
│├───────────────────────────────┤│ │ ┌─────────────────────────┐
|
||||
││CID 5 ││ │ │ e2 - entry change log │
|
||||
│├───────────────────────────────┤│ │ │ ┌─────────────────────┐ │
|
||||
││CID 6 ││ │ │ │CID 2 │ │
|
||||
│├───────────────────────────────┤│ │ │ │┌───────────────────┐│ │
|
||||
││CID 7 ││ └──────────┼─▶│recycle ││ │
|
||||
│├───────────────────────────────┤│ │ │└───────────────────┘│ │
|
||||
││CID 8 ││ │ └─────────────────────┘ │
|
||||
│├───────────────────────────────┤│ │ ... │
|
||||
││CID 9 ││ │ │
|
||||
│├───────────────────────────────┤│ └─────────────────────────┘
|
||||
││CID 10 ││
|
||||
│├───────────────────────────────┤│
|
||||
││CID 11 ││
|
||||
│├───────────────────────────────┤│
|
||||
││CID 12 ││
|
||||
│└───────────────────────────────┘│
|
||||
└─────────────────────────────────┘
|
||||
|
||||
This allows expression of both:
|
||||
|
||||
* An ordered set of changes globally to be applied to the set of entries
|
||||
* Entries to internally maintain their set of ordered changes
|
||||
|
||||
Entry Snapshots
|
||||
===============
|
||||
|
||||
Within an entry there may be many changes, and if we have an old change inserted, we need
|
||||
to be able to replay those events. For example:
|
||||
|
||||
::
|
||||
|
||||
┌─────────────────────────────────┐ ┌─────────────────────────┐
|
||||
│ Changelog Index │ │ e1 - entry change log │
|
||||
┌───────────────────────────────┐ │ │ │ ┌─────────────────────┐ │
|
||||
│CID 1 ─┼──┼─────────────▶ │ │ │CID 2 │ │
|
||||
└───────────────────────────────┘ │┌───────────────────────────────┐│ │ │┌───────────────────┐│ │
|
||||
││ ││ │ ││create: { ││ │
|
||||
││CID 2 ││ ┌──────────┼─▶│ attrs ││ │
|
||||
││transitions { ││ │ │ ││} ││ │
|
||||
││ create: uuid - e1, ────────┼┼──┘ │ │├───────────────────┤│ │
|
||||
││ modify: uuid - e1, ────────┼┼─────────────┼─▶│ modify: attrs ││ │
|
||||
││ recycle: uuid - e2,────────┼┼──┐ │ │└───────────────────┘│ │
|
||||
││} ││ │ │ └─────────────────────┘ │
|
||||
││ ││ │ │ ... │
|
||||
│├───────────────────────────────┤│ │ │ │
|
||||
││CID 3 ││ │ │ │
|
||||
│├───────────────────────────────┤│ │ └─────────────────────────┘
|
||||
││CID 4 ││ │
|
||||
│├───────────────────────────────┤│ │ ┌─────────────────────────┐
|
||||
││CID 5 ││ │ │ e2 - entry change log │
|
||||
│├───────────────────────────────┤│ │ │ ┌─────────────────────┐ │
|
||||
││CID 6 ││ │ │ │CID 2 │ │
|
||||
│├───────────────────────────────┤│ │ │ │┌───────────────────┐│ │
|
||||
││CID 7 ││ └──────────┼─▶│recycle ││ │
|
||||
│├───────────────────────────────┤│ │ │└───────────────────┘│ │
|
||||
││CID 8 ││ │ └─────────────────────┘ │
|
||||
│├───────────────────────────────┤│ │ ... │
|
||||
││CID 9 ││ │ │
|
||||
│├───────────────────────────────┤│ └─────────────────────────┘
|
||||
││CID 10 ││
|
||||
│├───────────────────────────────┤│
|
||||
││CID 11 ││
|
||||
│├───────────────────────────────┤│
|
||||
││CID 12 ││
|
||||
│└───────────────────────────────┘│
|
||||
└─────────────────────────────────┘
|
||||
|
||||
|
||||
Since CID 1 has been inserted previous to CID 2 we need to "undo" the changes of CID 2 in
|
||||
e1/e2 and then replay from CID 1 and all subsequent changes affecting the same UUID's to
|
||||
ensure the state is applied in order correctly.
|
||||
|
||||
In order to improve the processing time of this operation, entry change logs need
|
||||
snapshots of their entry state. At the start of the entry change log is an anchor
|
||||
snapshot that describes the entry as the sum of previous changes.
|
||||
|
||||
::
|
||||
|
||||
┌─────────────────────────┐
|
||||
│ e1 - entry change log │
|
||||
│ ┌─────────────────────┐ │
|
||||
│ │Anchor Snapshot │ │
|
||||
│ │state: { │ │
|
||||
│ │ ... │ │
|
||||
│ │} │ │
|
||||
│ │ │ │
|
||||
│ ├─────────────────────┤ │
|
||||
│ │CID 2 │ │
|
||||
│ │┌───────────────────┐│ │
|
||||
│ ││create: { ││ │
|
||||
│ ││ attrs ││ │
|
||||
│ ││} ││ │
|
||||
│ │├───────────────────┤│ │
|
||||
│ ││ modify: attrs ││ │
|
||||
│ │└───────────────────┘│ │
|
||||
│ ├─────────────────────┤ │
|
||||
│ │Snapshot │ │
|
||||
│ │state: { │ │
|
||||
│ │ ... │ │
|
||||
│ │} │ │
|
||||
│ │ │ │
|
||||
│ └─────────────────────┘ │
|
||||
│ ... │
|
||||
│ │
|
||||
└─────────────────────────┘
|
||||
|
||||
In our example here we would find the snapshot preceeding our newely inserted CID (in this case
|
||||
our Anchor) and from that we would then replay all subsequent changes to ensure they apply
|
||||
correctly (or are rejected as conflicts).
|
||||
|
||||
For example if our newly inserted CID was say CID 15 then we would use the second snapshot
|
||||
and we would not need to replay CID 2. These snapshots are a trade between space (disk/memory)
|
||||
and replay processing time. Snapshot frequency is not yet determined. It will require measurement
|
||||
and heuristic to determine an effective space/time saving. For example larger entries may want fewer
|
||||
snapshots due to the size of their snapshots, where smaller entries may want more snapshots
|
||||
to allow faster change replay.
|
||||
|
||||
Replay Processing Details
|
||||
=========================
|
||||
|
||||
Given our CID 1 inserted prior to other CID's, we need to consider how to replay these effectively.
|
||||
|
||||
If CID 1 changed uuid A and B, we would add these to the active replay set. These are based on the
|
||||
snapshots which are then replayed up to and include CID 1 (but no further).
|
||||
|
||||
From there we now proceed through the changelog index, and only consider changes that contain A or B.
|
||||
|
||||
Let's assume CID 3 operated on B and C. C was not considered before, and is now added to the replay
|
||||
set, and the same process begins to replay A, B, C to CID 3 now.
|
||||
|
||||
This process continues such that the replay set is always expanding to the set of affected
|
||||
entries that require processing to ensure consistency of their changes.
|
||||
|
||||
If a change is inconsistent or rejected, then it is rejected and marked as such in the changelog
|
||||
index. Remember a future replay may allow the rejected change to be applied correctly, this rejection
|
||||
is just metadata so we know what changes were not applied.
|
||||
|
||||
Even if a change is rejected, we still continue to assume that the entries include in that set of changes
|
||||
should be consider for replay. In theory we could skip them if they were added in this change, but
|
||||
it's simpler and correct to continue to consider them.
|
||||
|
||||
Changelog Comparison - Replication Update Vector (RUV)
|
||||
======================================================
|
||||
|
||||
|
@ -220,12 +412,57 @@ changelog - we have changes from min to max. If a server provides it's ruv, and
|
|||
is lower than our min, we must consider that server has been disconnected for "too long" and
|
||||
we are unable to supply changes until an administrator intervenes.
|
||||
|
||||
As a more graphical representation, we could consider our ruv as follows:
|
||||
|
||||
::
|
||||
|
||||
┌─────────────────────┐ ┌─────────────────────────────────┐ ┌─────────────────────────┐
|
||||
│RUV │ │ Changelog Index │ │ e1 - entry change log │
|
||||
│┌───────────────────┐│ │┌───────────────────────────────┐│ │ ┌─────────────────────┐ │
|
||||
││{d_uuid, s_uuid}: ││ ─ ─ ─ ─ ─ ─ ─▶│CID 1 ││ │ │CID 2 │ │
|
||||
││ min: CID 2 ────┼┼────┼─┐ │├───────────────────────────────┤│ │ │┌───────────────────┐│ │
|
||||
││ max: CID 4 ────┼┼──────┤ ││ ││ │ ││create: { ││ │
|
||||
│├───────────────────┤│ │ ├───────────▶│CID 2 ││ ┌──────────┼─▶│ attrs ││ │
|
||||
││{d_uuid, s_uuid}: ││ │ ││transitions { ││ │ │ ││} ││ │
|
||||
││ min: CID 1 ─ ─ ┼│─ ─ ┘ │ ││ create: uuid - e1, ────────┼┼──┘ │ │├───────────────────┤│ │
|
||||
││ max: CID 8 ─ ─ ┼│─ ─ ┐ │ ││ modify: uuid - e1, ────────┼┼─────────────┼─▶│ modify: attrs ││ │
|
||||
│├───────────────────┤│ │ ││ recycle: uuid - e2,────────┼┼──┐ │ │└───────────────────┘│ │
|
||||
││{d_uuid, s_uuid}: ││ │ │ ││} ││ │ │ └─────────────────────┘ │
|
||||
││ min: CID 3 ────┼┼──┐ │ ││ ││ │ │ ... │
|
||||
││ max: CID 12────┼┼──┤ │ │ │├───────────────────────────────┤│ │ │ │
|
||||
│└───────────────────┘│ ├───┼───────────▶│CID 3 ││ │ │ │
|
||||
└─────────────────────┘ │ │ │ │├───────────────────────────────┤│ │ └─────────────────────────┘
|
||||
│ └───────────▶│CID 4 ││ │
|
||||
│ │ │├───────────────────────────────┤│ │ ┌─────────────────────────┐
|
||||
│ ││CID 5 ││ │ │ e2 - entry change log │
|
||||
│ │ │├───────────────────────────────┤│ │ │ ┌─────────────────────┐ │
|
||||
│ ││CID 6 ││ │ │ │CID 2 │ │
|
||||
│ │ │├───────────────────────────────┤│ │ │ │┌───────────────────┐│ │
|
||||
│ ││CID 7 ││ └──────────┼─▶│recycle ││ │
|
||||
│ │ │├───────────────────────────────┤│ │ │└───────────────────┘│ │
|
||||
│ ─ ─ ─ ─ ─ ─ ─▶│CID 8 ││ │ └─────────────────────┘ │
|
||||
│ │├───────────────────────────────┤│ │ ... │
|
||||
│ ││CID 9 ││ │ │
|
||||
│ │├───────────────────────────────┤│ └─────────────────────────┘
|
||||
│ ││CID 10 ││
|
||||
│ │├───────────────────────────────┤│
|
||||
│ ││CID 11 ││
|
||||
│ │├───────────────────────────────┤│
|
||||
└───────────────▶│CID 12 ││
|
||||
│└───────────────────────────────┘│
|
||||
└─────────────────────────────────┘
|
||||
|
||||
It may be that we also add a RUV index that allows the association of exact set of CID's to a
|
||||
server's cl, or if during CL replay we just iterate through the CL index finding all values that are
|
||||
greater than the set of min CID's requested in this operation.
|
||||
|
||||
Changelog Purging
|
||||
=================
|
||||
|
||||
In order to prevent infinite growth of the changelog, any change older than a fixed window X
|
||||
is trimmed from the changelog. When trimming occurs this moves the "min" CID in the RUV up to
|
||||
a higher point in time.
|
||||
a higher point in time. This also trims the entry change log and recreates a new anchor
|
||||
snapshot.
|
||||
|
||||
RUV cleaning
|
||||
============
|
||||
|
|